EU GMP Non-Compliance: Ocb Pharmaceutical S.R.L. – relabelling and distribution obscured bismuth subsalicylate supply-chain traceability
Following an inspection ending 27 August 2026, the Spanish NCA identified nine deficiencies: one critical and eight major. The critical deficiency concerned repackaging and relabelling bismuth subsalicylate from a Chinese manufacturer operating outside the EU GMP framework. OCB assigned new batch numbers, copied supplier results into certificates of analysis, replaced or removed original labels, and distributed material without adequately preserving manufacturer identity and supply-chain traceability. Major deficiencies affected investigations, CAPA, risk management, data integrity, personnel qualification, materials traceability, contamination controls, cleaning, facilities, documentation and quality oversight. The NCA temporarily suspended all API and intermediate manufacturing at Canovelles and suspended distribution and sale of material manufactured, repackaged or relabelled there, pending correction and verification through reinspection. No recall was considered necessary because no specific defects in marketed batches were detected. The NCA said suspension of the site’s bismuth subnitrate CEP should be considered. It also withdrew the current GMP certificate and recommended justified testing by customers, alternative qualified sources, and exclusion from new or ongoing applications while the statement remains in force.